METROPOLITAN REFORMATIONS

In Chapter III of the Act under No. 3843/2010, published in the FEK A62/2010 titled "Identity buildings, construction overruns and changes of use, metropolitan regeneration and other provisions" provided the following:

CHAPTER C MITROPOLITIKES ANAPLASEIS AND OTHER PROVISIONS

Article 11 Restoration Faliron Bay Attica "To make a comprehensive rehabilitation program in the Faliro Bay Attica ......."

Article 12 Unification of Archaeological Sites and Regeneration "The company with the name" Unification of Archaeological Sites of Athens SA "and the name" EAXA SA "was renamed ....."

RENEWABLE ENERGY SOURCES

Published Law 3851/10 "to Accelerate Development of Renewable Energy to Tackle Climate Change" on FEK. 85/A/4.6.2010 which amended Law 3468/2006 (Government Gazette 129/27-6-2006 ) and which attempts to simplify the installation process RES to reduce the time needed. Rationalize the pricing of electricity produced from RES kaiSIThYA stations. Also establishes special fee and incentives to domestic consumers settled areas of RES projects. Addressed issues of location RES. Measures for reducing energy consumption in new buildings and old to be renovated completely.

DECISIONS - CIRCULARS

The first guidelines for the implementation of Law 3851/10 provided for the Energy Regulatory Authority from 19.7.10 to AF/F1oik.14586 document. Download it here.

Specific terms and conditions for photovoltaics and solar systems in buildings and land within the project and settlements. Download here the Ministerial Decision of 08/10/25 and for buildings and land outside the city plan download here the same day.


A recent Joint Ministerial Decision completed the special program anoptyxis PV in buildings.
Click here to download the full text. The development in those systems and islands of Greece, and in shelters housing in facades and elsewhere.

Most recent decision from 09.15.10 which rearrange the ratio installed power between different renewable technologies. Click here to download the full text.

Issue in Presidential Decree PD 100/2010 - Official Gazette A 177 / 06.10.2010 establishing the qualifications of energy inspectors, the establishment of institutions and the licensing process chorigisis energy inspectors, and to pay them.

"BLANKS" LAND

Finally the possibility of issuing building permits granting land plots blind lanes:


Egk-3678/1/28-1-10 Apof-3678/1/10 Egk-3678/1/28-1-2010
Egk-3678/1/10 Egk-3678/1/2010
E-1/10 Egk-1/2010
With CTE -1828/2008 the provisions of paragraph 2 and paragraph 3 of Art-6 of PD/24-4-85 (FEK-181/D/85) is invalid "which defines the conditions and procedure for territorial concessions by private lanes and putting in common use in order to become developable property devoid of any person in a public area and incapable, therefore, be structured.
Read here the circular 1 / 10


Apof-10237/3/12-3-10 Egk-3/10 [VALID FROM 10/03/12] E-3/10
Clarifications on the implementation of Egk-1/10 and directions for the design of divisional
urban design in the paragraph 3 of Art-19 of N-2508/97 (FEK-128/A/97)
Also the Apof-10237/3/12-3-10 Egk-3/10 given details of the implementation of Egk-1/10 and directions for the design of partial urban study in the paragraph 3 of Art-19 of N -2508/97 (FEK-128/A/97)

ΣΑΣ ΕΝΔΙΑΦΕΡΟΥΝ